Rig 1: UDR 1000

Rig 1 specifications. The UDR 1000 sits on an 8×8 Tatra with reduction hubs; this enables the rig the versatility to navigate almost all terrains.

The UDR 1000 has the following capabilities:

  • 9mt Rod pull
  • 70kN Pull Down
  • 112kN Pull Back
  • 900/350 compressor for onboard air.
  • Diamond Core: PQ to 600mt, HQ to 1000mt and NQ to 1500mt
Mineral Exploration Drilling Rig 1 Specifications - MJ Drilling Adelaide
UDR 1000

Rig 2: UDR 650

Rig 2 specifications. This unit is mounted on a 1995 Volvo 8x4x4.

UDR 650 (Rig 2) has the following capabilities:

  • 6mt Rod pull
  • 45kN Pull Down
  • 75kN Pull Back
  • Bean pump for diamond core
  • Gardener Denver duplex mud pump
  • Diamond Core: HQ to 575mt and NQ to 870mt
Mineral Exploration Drilling Rig 2 Specifications - MJ Drilling Adelaide
UDR 650

Rig 3: UDR 650

Rig 3 specifications. This sits on top of a 1985 Kenworth 8x4x4.

UDR 650 (Rig 3) has the following capabilities:

  • 6mt Rod pull
  • 45kN Pull Down
  • 75kN Pull Back
  • Bean pump for diamond core
  • Gardener Denver duplex mud pump
  • Diamond Core: HQ to 575mt and NQ to 870mt
Mineral Exploration Drilling Rig 3 Specifications - MJ Drilling Adelaide
UDR 650

Support Vehicles

Mineral Exploration - MJ Drilling Support Vehicles
Sterling Prime Mover

2008 Sterling 6×4 Prime Mover with a 2013 Krueger drop deck.

The drop deck has both water and diesel storage and carries our air rod string plus drilling fluids etc.

Remote Mineral Exploration - MJ Drilling Support Vehicles
Mercedes Benz

1989 Mercedes Benz 6×4 with reduction hubs.

Equipment Maintenance

Although our equipment isn’t straight off the showroom floor, we take great pride in our mechanical reliability.

Our equipment is always serviced within manufacturers specifications.

We have a service and repair register that enables us to ensure our equipment is serviced on time every time.

We also track critical items such as pressure vessel certification, relief valve certification, fire suppression and all steel ropes on the rigs are changed 12 monthly double shift.

Drilling Rig Maintenance - MJ Drilling
Maintenance

MJ Drilling Mineral Exploration Fleet